Click here to make tpub.com your Home Page

Page Title: Charging. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-279-13-1
NOTE
Perform Step 14 if charge did not enter system.
14. Position bulk container (13) in upright position and open low-side hand valve (15) to draw vapor into
system. Leave low-side hand valve (15) open until correct weight of refrigerant has entered system.
Close low-side hand valve (15).
NOTE
If refrigerant is slow to enter system because of low outside temperatures, vaporization may be quickened
by placing refrigerant in tub of warm water. Temperature should not exceed 125F (52C).
15. Disconnect hose (10).
16. Start engine (TM 9-2320-279-10).
17. Open high side and low-side hand valves (14) and (15) to recover refrigerant from lines.
18. Check for leaks.
19. Check operation of air conditioning system.
20. Shut OFF engine (TM 9-2320-279-10).
0052-47

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business