Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 6-4Con tinued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

STEP  6. STEP  7 . STEP  8. STEP  9. STEP   10. STEP   11. NOTE: NOTE: CONNECT   HOSE   FROM   PRESSURE   TESTING   HOOKUP   LOOSELY TO   SUCTION   SERVICE   VALVE   OPEN/NITROGEN   DRUM   SHUT- OFF   VALVE   SLIGHTLY   TO   PURGE   HOSE. TIGHTEN    CON- NECTION   AT   SUCTION   SERVICE   VALVE. OPEN  SHUTOFF VALVE. BUILD   UP   SYSTEM   PRESSURE   UNTIL   THE   DIS- CHARGE   PRESSURE   REACHES   150   PSIG. CLOSE   SHUTOFF VALVE. DISCONNECT   HOSE   FROM   SUCTION   SERVICE VALVE   AND   DISCHARGE   SERVICE   VALVE. LEAK  TEST  IN  ACCORDANCE  WITH  PARAGRAPH   6.5.a. ATTACH   A   SUITABLE   VACUUM   PUMP   TO   SUCTION   SERVICE VALVE  AND  A  MANOMETER  TO  THE  DISCHARGE  SERVICE VALVE. OPERATE   THE   VACUUM   PUMP   UNTIL   THE   MANO- M  E  T  E  R       I  N  D  I  C  A  T  E  S     2 .  5      M  M     H G .    A   B  S .    ( M i l l i m e t e r s    OF MERCURY,    ABSOLUTE). STOP   THE   PUMP. ATTACH   HOSE   FROM   REFRIGERANT DRUM,   PURGE   AIR   FROM   LINE   WITH   REFRIGERANT   AND SLOWLY   BREAK   THE   VACUUM   THROUGH   THE   SUCTION SERVICE   VALVE    UNTIL   760   M M   HG   ABS   IS  READ   O  N MANOMETER. REMOVE   LINE   FROM   SUCTION   SERVICE VALVE. REMOVE   REFRIGERANT   DRUM   AND   CONNECT   VACUUM   PUMP TO   SUCTION   SERVICE   VALVE. PURGE   AIR’   FROM   HOSE AND  START  PUMP. OPERATE   PUMP   UNTIL   MANOMETER AGAIN   REACHES   2.5   MM   HG   ABS. REMOVE   LINE   FROM   SUCTION   SERVICE   VALVE   AND   ALLOW UNIT   TO   STAND   UNDER   VACUUM   FOR   APPROXIMATELY 12  HOURS. IF   NO   NOTICABLE   RISE   IN   PRESSURE   OC- CURS,   THE   SYSTEM   IS   READY   FOR   CHARGING. REMOVE VACUUM   PUMP   AND   MANOMETER. INSTALL    CAPS. RISE   IN   PRESSURE   WILL   BE   INFLUENCED   BY   AMBlENT TEMPERATURE. MAKE   SURE   VACUUM   IN   SYSTEM   IS COMPLETELY   RELIEVED   BEFORE   CHARGING. WHEN   UNIT   IS   OPERATING   DO   NOT   OPEN   BOTH   MANl- FOLD   VALVES   AT   THE   SAME   TIME. o ME  4120 - 308 - 15/6 - 4    3 Figure  6-4—Con  tinued. 6-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business