Quantcast EVAPORATOR COIL INSPECTION INSTALLED/CLEANING 4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: EVAPORATOR COIL INSPECTION INSTALLED/CLEANING
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 4-30.2. Electrical Heating Elements - Models EKP and FGG
Up
TM-5-4120-359-14 Air Conditioner Split Package 18 000 BTU/HR Cooling 30 000 BTU/HR Heating 208 Volt 3 Phase 400 Hertz Manual
Next
EVAPORATOR COIL - 506780163
TM 5-4120-359-14
g. Installation
(1) Carefully slip the heater assembly down into the unit.
(2) Using screwdriver, secure the heater assembly to the flanges of the evaporator coil with four screws.
(3) See tags and wiring diagram, figure 4-3, and connect heater leads at terminal block TB-2. Remove the tags.
Follow-on Procedure: Install the fan and motor assembly. (See paragraph 4-21.)
4-33. EVAPORATOR COIL INSPECTION INSTALLED/CLEANING
Preliminary Procedure: 1. Remove return air screen and frame. (See paragraph 3-18.)
2. Remove fan and motor assembly. (See paragraph 4-21.)
Tools: Plastic fin comb
Soft bristled brush
Vacuum cleaner with brush attachment or low pressure compressed air source
Safety glasses or goggles
a. Inspection of installed items
(1) Check for accumulated dirt. Clean if an accumulation of dirt is evident.
4-76.2 Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.