Quantcast FUSE (F1) AND FUSEHOLDER (XF1) - 506780192 4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: FUSE (F1) AND FUSEHOLDER (XF1)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 4-47. Temperature Control Component Board (A1)
Up
TM-5-4120-359-14 Air Conditioner Split Package 18 000 BTU/HR Cooling 30 000 BTU/HR Heating 208 Volt 3 Phase 400 Hertz Manual
Next
Figure 4-49. Fuse (F1) and Fuseholder (XF1)
TM 5-4120-359-14
d. Installation
(1) Place the temperature control component board on the four nut, spacers, and screws that were left in the box.
(2) Use a screwdriver to retain the screws from the bottom of the box.
(3) Using socket and ratchet, secure the temperature control component board with four nuts and lock washers.
(4) Install nine quick-disconnect terminals on terminals according to tags, wire markings, and wiring diagram,
(5) Remove tags.
(6) Place cover on box and line up holes.
(7) Using screwdriver, attach the cover with six screws and lock washers. Do not overtighten, it will cause
distortion.
Follow-on Procedure: Install evaporator section electrical module assembly. (See paragraph 4-41.)
4-49. FUSE (F1) AND FUSEHOLDER (XF1)
Preliminary Procedure: Remove top evaporator cover. (See paragraph 3-21.)
a. Test/Inspect fuse (F1)
(1) Push in, turn, and remove the fuse holder cap.
Figure 4-48. Fuse (F1)
4-106

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.