Quantcast RECTIFIER (CR1) AND CAPACITOR (C1) TEST (Continued) 4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: RECTIFIER (CR1) AND CAPACITOR (C1) TEST (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 4-51.1. Rectifier (CR1) and Capacitor (C1) (Models EKP and FGG)
Up
TM-5-4120-359-14 Air Conditioner Split Package 18 000 BTU/HR Cooling 30 000 BTU/HR Heating 208 Volt 3 Phase 400 Hertz Manual
Next
RELAYS (K3, K4, AND K5) TEST
TM 5-4120-359-14
(4) Place rectifier in box and aline holes.
(5) Using screwdriver, secure rectifier with two screws.
(6) Place cover on box and line up holes.
(7) Using screwdriver, attach the cover with six screws and washers. Do not overtighten, it will cause distortion.
f.
Installation - Models EKP and FGG
(1) Match wire leads and capacitor to rectifier, using tags, wire markings and wiring diagram figure 4-3.
(2) Solder leads and capacitor to rectifier.
(3) Remove tags.
(4) Place rectifier in box and aline holes.
(5) Using screwdriver, secure rectifier with screw.
(6) Place cover on box and line up holes.
(7) Using screwdriver, attach the cover with six screws and lockwashers.
Do not overtighten, it will cause
distortion.
Follow-on Procedure: Install evaporator section electrical module assembly. (See paragraph 4-41.)
4-110.2 Change 5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.