Quantcast RELAYS (K3, K4, AND K5) TEST 4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: RELAYS (K3, K4, AND K5) TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
RECTIFIER (CR1) AND CAPACITOR (C1) TEST (Continued)
Up
TM-5-4120-359-14 Air Conditioner Split Package 18 000 BTU/HR Cooling 30 000 BTU/HR Heating 208 Volt 3 Phase 400 Hertz Manual
Next
RELAYS (K3, K4, AND K5) TEST (continued)
TM 5-4120-359-14
4-52. RELAYS (K3, K4, AND K5) TEST
Conditions of test: 1. Evaporator section electrical module assembly must be connected to an operable air conditioner
and remote control assembly.
2. 208V, 3 phase, 400 Hz power, and power cable must be available.
3. Top evaporator cover must be removed. (See paragraph 3-21.)
4. Top module cover must be removed. (See paragraph 4-42.)
Figure 4-52. Relay (K3, K4, and K5) Test
Change 2 4-111

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.