Quantcast ACTUATING CYLINDER - 506780246 4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: ACTUATING CYLINDER
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Figure 4-78. Receiver, Liquid Refrigerant
Up
TM-5-4120-359-14 Air Conditioner Split Package 18 000 BTU/HR Cooling 30 000 BTU/HR Heating 208 Volt 3 Phase 400 Hertz Manual
Next
Figure 4-79.1. Actuating Cylinder - Models EKP and FGG
TM 5-4120-359-14
(8) Install front condenser cover. (See paragraph 3-23.)
(9) Connect evaporator and condenser section assemblies. (See paragraph 4-14.)
(10) Evacuate and charge the refrigerant system. (See paragraphs 4-9 and 4-10.)
Follow-on Procedure: Install air conditioner on shelter. (See paragraph 3-26.)
4-75. ACTUATING CYLINDER
Preliminary Procedures:
1. Disconnect power.
2. Remove top condenser cover. (See paragraph 3-25.)
a. Inspect
(1) Check actuating cylinder for signs of leakage. If leakage is suspected, leak test per paragraph 4-8.
(2) Check that mounting nuts and push-pull cable attachment hardware are in place and secure. Replace if
missing. Tighten if loose.
Figure 4-79. Actuating Cylinder - Model DHF
Change 2 4-157

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.