4120-01-069-1321)">

 

Click here to make tpub.com your Home Page

Page Title: RELAY (K1)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-359-14
c.
Installation
(1) Position time totalizing meter on chassis.
(2) Using screwdriver and wrench, secure time totalizing meter to chassis with three screws and lock nuts.
(3) See tags, wire marking, and wiring diagram (figure 4-3), and connect leads.
(4) Remove tags.
(5) Position cover on chassis.
(6) Using screwdriver and wrench, secure cover to chassis with eight screws, six lock nuts, and two lock
washers.
Follow-on Procedures: 1. Install condenser section electrical module. (See paragraph 4-90.)
2. Connect power.
4-94. RELAY (K1)
a. Test
(1) Disconnect power.
(2) Using screwdriver, remove eight screws and pull condenser section electrical module out from condenser
housing.
(3) Using screwdriver and wrench, remove eight screws, six nuts, and two lock washers that hold cover to
chassis.
(4) Pull cover away from chassis as far as wiring harness will allow.
WARNING
The following test must be conducted with the power on.
Exercise extreme
caution.
NOTE
Electrical module assembly must be connected to an operable air conditioner with
remote control assembly and 208V, 3 phase, 400 Hz power for voltage tests.
(5) The K1 relay controls the compressor motor.
(6) Check to see that P12 and P13 connector plugs are connected at back of electrical module cover.
4-190

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business