Quantcast Preparation  For  Storage

Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Preparation For Storage
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
INSTALLATION - TM-5-4120-375-14_167
Up
TM-5-4120-375-14 Air Conditioner Horizontal Compact 18 000 BTU 208 Volt 3 Phase 50/60 Hertz NSN
Next
CHAPTER 5 DIRECT SUPPORT MAINTENANCE INSTRUCTIONS - TM-5-4120-375-14_169
TM5-4120-375-14 SECTION PREPARATION  FOR STORAGE OR  SHIPMENT 4-25   Preparation  For  Storage VI Make sure the power supply is off at the disconnecting  the  power  supply  line. source  before The air conditioner is prepared for storage or movement the  following: 1. Turn off electrical power supply to air conditioner power cable from unit. by performing and disconnect 2. Remove the external power connector and secure to inside of the maintenance  panel. 3. Prepare the air conditioner assembly for storage in accordance with TM-740-90-1. 4-26 Shipment CAUTION Keep unit vertical. 1. Short  Distance  Movement Lift unit at base with a forklift or carry unit to new worksight using lifting rings on top of unit. 2. Long  Distance  Movement Crate  the  air  conditioner,  providing  adequate  protection  for  panels and control box. Refer to TM 38-250 for crate job. Provide suitable blocking and tie downs to prevent unit from shifting during  transfer. 4-134

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc.