Click here to make tpub.com your Home Page

Page Title: JUNCTION BOX-Continued.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4120-386-14
4-25. JUNCTION BOX-Continued.
REMARKS
LOCATION/ITEM
ACTION
Inspection -
(Continued)
5. Terminal
Inspect terminal board (TB1)
a.
Board (TB1)
for dents, breaks, nicks or
and Marker
damaged terminals.
Strip
b. If unrepairable, replace
terminal board.
c.  Inspect marker strip for
illegibility or damage.
d . Replace marker strip if
damaged.
Test
Refer to
6. Time Delay
Check coils of relays (Kl,
a.
Relay (K1)
schematic and
K2, K3, K4 and K5) for
wiring diagram
continuity.
(Figures E-1
Heater
b. Actuate the coils of the relays
Relay (K2)
and E-2)
with a 24-volt DC power source.
c.  Check for continuity across
Motor Re-
closed contacts and discon-
lay (K3)
tinuity across open contacts.
d . Replace if fails test.
Fan Motor
Relay (K4),
Phase Sequence
Relay (KS)
Refer to
7. Control
Check continuity of control
a.
Circuit
schematic and
circuit breaker in ON and OFF
Breaker
wiring diagram
position.
(Figures E-1
Replace if fails test.
b.
and E-2)
4-58

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business