Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REFRIGERATED CONTAINER SYSTEM OPERATOR TROUBLESHOOTING PROCEDURES Continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 55-8145-221-14&P 0010 00-4 REFRIGERATED CONTAINER SYSTEM 0010 00 OPERATOR TROUBLESHOOTING PROCEDURES – Continued REFRIGERATED CONTAINER TROUBLESHOOTING  - Continued. MALFUNCTION TEST OR INSPECTION CORRECTIVE ACTION 1. Check    for    improperly    stacked cargo inside container. Re-stack cargo as required so that: a.   Cargo does not block refrigeration unit evaporator coil (on container front wall). b.   Cargo is at least one foot from top of container roof. c.   Cargo does not contact doors when closing. d.   Cargo does not block refrigeration unit evaporator coil (on container front wall). e.   Air can circulate between cargo and container side walls. 4. TEMPERATURE INSIDE CONTAINER WILL NOT STABILIZE. DOORS CLOSED Table 1.  Refrigerated Container Troubleshooting Procedures - Continued DOORS OPEN 3 2 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business