Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Follow-on procedure
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-4120-389-14 (5) Install clamp on capillary tubes. (6) Install clamp on casing with screw and lock nut. (7) See tags and wiring diagram (FO-1) and connect wire leads.  Remove tags. (8) Replace dehydrator (See para.  5-10). (9) Leak check the flare nut connection (See para.  5- 6). (10) Evacuate the system (See para.  5-7). (11) Charge the system (See para.  5-8). Follow-on procedure: Install top cover (See para.  4-14). 5-52

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business