Click here to make tpub.com your Home Page

Page Title: AIR CONDITIONER INSTALLATION - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
WARNING
During lifting procedures, take care that shock mounts are not damaged.
11
Slowly lower air conditioner into position, align, and loosely attach remaining installation
hardware.
12
With air conditioner slightly supported by lifting device, push air conditioner firmly toward
shelter to compress weather seal. At the same time, release tension on lifting device and secure
the installation hardware.
13
Remove sling attachments from air conditioner and move lifting device out of the way.
14
Install the rain shield around the air conditioner to shelter joint. (See Shelter Manual.)
15
Install the fresh air duct and fresh air EMI screen (not supplied with air conditioner).
NOTE
The fresh air intake duct and fresh air EMI screen may be mounted on the left or right
side of the air conditioner by exchanging it with one of the two fresh air cover plates.
16
Connect all drain lines or hoses, if applicable.
17
Roll the fabric condenser cover up and tie it in place.
18
Check to see that power cable and remote control cable(s) (if used) are connected at shelter
washboard.
19
Install the remote control assembly in the shelter if removed. The cable must be connected first.
Then align the four captive screws and turn them evenly to obtain a good EMI gasket seal. If
remote control is to be installed in air conditioner, disconnect, remove and store remote control
cable assembly from face of evaporator section at J7 receptacle and at J14 receptacle on rear of
control box. (Install captive protective cover on J7 receptacle).
20
Remove block-off assembly from face of evaporator section
21
Separate P14 receptacle and J15 plug. Mate J15 plug with J14 receptacle on rear of control box.
Isolate and store P14 receptacle.
22
Complete installation of control box assembly in face of evaporator section utilizing existing
fasteners.
23
Turn power to air conditioner on at circuit breaker.
24
Check air conditioner operation in all modes.
0006 00-9