Click here to make tpub.com your Home Page

Page Title: TERMINAL BOARD (TB1) AND JUMPERS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
TERMINAL BOARD (TB1) AND JUMPERS
THIS WORK PACKAGE COVERS:
Inspection of Installed Items
Removal
Installation
Tools and Special Tools
Screwdriver, flat tip
Screwdriver, cross tip
Materials/Parts
Terminal board
39TB-9
Personnel Required
Unit Technician
Equipment Conditions
Evaporator top cover removed (See
Evaporator section electrical module
assembly removed. (See WP0032.)
Electrical module top cover removed. (See
INSPECTION OF INSTALLED ITEMS
1
Check terminal board for loose or corroded terminals, cracks, and obvious damage. Replace if
terminals are corroded, or if terminal board is cracked or broken.
2
Check that jumpers are in place and in good condition. Terminals 2 and 3, 4 and 5, 6 and 7, and
8 and 9 should be jumped.
0039 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business