Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM9 4120-423-14&P
2
Wrap wet rags around expansion valve body.
3
While purging the system with nitrogen, braze the tubing joints.
4
Replace the dehydrator. (See WP0080).
5
Secure sensing bulb to compressor inlet suction line with insulation. Apply in spiral with
overlapping edges. Be sure sensing bulb is making good metal-to-metal contact with compressor
inlet suction line.
6
Coil excess capillary tubing above expansion valve.
7
Secure expansion valve to housing with screw, lockwasher, locknut, and clamp.
8
Leak test all newly connected joints and those in the repair area. (See WP0073).
9
Evacuate and charge the Refrigerant R-22 system. (See WP0074 and WP0075).
10
Install left and right end condenser covers. (See WP0045).
11
Install air conditioner on shelter. (See WP0006).
12
Connect power.
END OF TASK
0082 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business