Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
INSTALLATION HARDWARE UNIT MAINTENANCE - Continued
0044-00
INSPECTION
1.
Inspect six screws (1) and flat washers (2) for damage.
2.
Inspect twelve resilient mounts (3), six elastomeric tubes (5) and six spacers (4) for damaged or worn out
conditions.
3.
Replace damaged hardware.
INSTALLATION
1.
Assemble onto each of six screws (1), a flat washer (2), a spacer (4), an elastomeric tube (5) and a resilient mount
(3).
2.
Install the above screws, flat washers, spacers, elastomeric tubes and resilient mounts through the bottom of
enclosure plate and then install one additional resilient mount (3) on each of the four screws (1), on top of the
enclosure mounting plate (6).
3.
Align the air conditioner on top of the resilient mounts (3) and screws (1), which attach the air conditioner to the
enclosure mounting plate (6).
4.
Tighten the screws (1) into the bottom of air conditioner.
END OF TASK
0044-00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business