Click here to make tpub.com your Home Page

Page Title: Receiving inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-428-14
0016 00
Unpacking Air Conditioner - continued
2. To remove the shipping container, cut the metal bands that hold the top and sides of the container to the base. Lift
the container vertically and remove it from the base and cabinet.
3. Remove cushioning around the top of the cabinet and retain, if reuse is expected. Remove the presentation barrier by
tearing around the bottom of the cabinet. Remove the technical publications envelope and the accessory sack and put
them in a secure place.
NOTE
Leave the cabinet bolted to the shipping cabinet until it is time to place it in the
installation position. All receiving inspections can be conducted without removal from
the pallet.
Receiving inspection
Perform receiving inspection of the air conditioner as follows:
1. Inspect the equipment for damage incurred during shipping. If the equipment has been damaged, report damage on
DD Form 6, Packaging Improvement Report.
2. Check for shipment completeness by comparing the equipment to the packing slip. Report all discrepancies in
accordance with DA Pamphlet 738-750, The Army Maintenance Management System.
3. Check for equipment modification.
NOTE
The unit weight (less the shipping pallet) is 190 pounds (86.2 kg) for the F9000H-4SPFI.
Use a forklift when moving or lifting the unit on the shipping pallet. Use four people, one
at each handle, to lift the unit into position.
4. To remove the pallet, raise the unit using a forklift. Remove four bolts from the bottom of the pallet.
INSTALLATION INSTRUCTIONS
Preparation for installation
Two input power connectors are provided on the air conditioner. Connector J1 is located on the front of the air conditioner,
above the control panel module. Connector J11 is located on the rear of the air conditioner, in the upper left corner.
NOTE
Air conditioners are shipped from the factory wired for the use of the J1 power connector.
If this connector is used, no change is necessary.
Determine which connector best suits your installation. If power source is inside the conditioned area, use J1. If power source
is outside the conditioned area, use J11. If the J11 connector is to be used on the F9000H-4SPFI, leads TB1-1--TB3-1--TB1-
2, TB3-2, and TB1-3--TB3-3 on the terminal board, TB3 must be moved from terminals 1, 2, and 3 to terminals 4, 5, and 6
respectively. Proceed as follows:
1. Remove the top front panel (evaporator section) from the air conditioner.
2. Disconnect wire TB1-1--TB3-1 from TB3 terminal 1and reconnect to terminal 4.
3. Disconnect wire TB1-2 TB3-2 from TB3 terminal 2 and reconnect to terminal 5.
4. (F9000H-4SPFI only) Disconnect wire TB1-3--TB3-3 from TB3 terminal 3 and reconnect to terminal 6.
5. Attach the top front panel (evaporator section) to the air conditioner.
0016 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business