Click here to make tpub.com your Home Page

Page Title: Shelter/Enclosure Preparation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-428-14
0016 00
.38 IN (.97 CM) MAX (WITH FABRIC
26.33 IN
COVER IN PLACE)
(66.88 CM)
CONDENSER FABRIC COVER (TIED IN
POSITION FOR UNIT OPERATION)
16.00 IN
(40.64 CM)
HANDLE (2 EACH SIDE)
RIGHT SIDE VIEW
BOTTOM PANEL OF
AIR CONDITIONER
.25 IN (.64 CM) MAX
RESILIENT
MOUNTS
ELASTOMERIC
TUBE
SPACER
CAP SCREW
WASHER
ENCLOSURE MOUNTING
PLATE
CROSS SECTION OF BOTTOM
MOUNTING HOLE AND
HARDWARE
(TYPICAL 4 PLACES)
1. Remove the condensate drain plug from the lower left rear corner of the air conditioner. Connect a drain line if the
air conditioner is mounted in a location where water pouring from the drain is objectionable or creates a hazard. The
fitting must have a male 1/8 27 NPT connection to the unit. Hose, rigid pipe, or tubing can be used to directly drain
water to a more desirable location.
2. Connect the power cable to input power source. (F9000H-4SPFI, 208 volt, 3 phase, 400 hertz air conditioner)
3. Run operational checks in accordance with WP 0017 00.
NOTE
For more information on air conditioner installations, refer to MIL-HDBK-116,
Environmental Control of Small Shelters.
0016 00-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business