Quantcast CONDENSATE DRAIN INSPECTION, CLEANING, AND REPLACEMENT

 

Click here to make tpub.com your Home Page

Page Title: CONDENSATE DRAIN INSPECTION, CLEANING, AND REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
FRESH AIR DAMPER AND ACTUATOR CLEANING AND INSPECTION
Up
TM-9-4120-428-14 Air Conditioner Horizontal Compact 9000 BTU/HR 208 Volt Three Phase 400 Hertz Model No. F9000H-4SPFI Manual
Next
CLEANING - TM-9-4120-428-140126
TM 9-4120-428-14
UNIT MAINTENANCE
AIR CONDITIONER, HORIZONTAL, COMPACT
CONDENSATE DRAIN INSPECTION, CLEANING, AND REPLACEMENT
INITIAL SETUP:
Equipment Condition
Tools
Remove the return air louver (WP 0021 00)
Refrigeration Unit Service Tool Kit,
WP 0000 00, Item 1
Materials/Parts
Tubing, WP 0000 00, Figure F-15
Tee Connector
DRAIN PAN TUBE
BULKHEAD
1
1
2
PIPE PLUG (MUST BE
1
2
REMOVED PRIOR TO
OPERATION)
1
3
DRAIN LINE (PART OF
1
HOUSING)
2
1
REMOVAL
1. Remove hose and wire clamps (1).
2. Pull nonmetallic tubing (2) loose from connection points
3. Pull nonmetallic tubing (2) loose from hose tee connector (3) in drain pan and housing.
INSPECTION
1. Check nonmetallic tubing (2) for cuts, splits, and deteriorated condition.
2. Check that aluminum tube from the bulkhead to the rear of the unit is not clogged.
3. Check that the hose tee connector (3) is not clogged.
0027 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.