Click here to make tpub.com your Home Page

Page Title:

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

MWO 55-8115-202-40-1
1. PURPOSE. The following procedure defines the equipment to which this MWO is applied and
how to install a Roller Slide Assembly Kit and an Exhaust Assembly Kit to a Refrigerated
Container (RC), Model SC209, National Stock Number (NSN) 8115-01-016-5909 for use with
Tactical Quiet Generator (TQG), NSN 6115-01-275-5061.
2. PRIORITY. This modification is classified as ROUTINE.
a. Equipment in Use. All RCs will be modified and completed no later than 90 days from the
date of receipt of the 10 kW TQG replacing the 10kW MEP Associated Support Item of
Equipment (ASIOE) generator. RCs not modified after this MWO's completion date will be
reported as Non Mission Capable (NMC), in accordance with applicable Army regulations.
b. Equipment in Wholesale Depot Supply or Maintenance Activities. The MWO will be
accomplished on serviceable RCs prior to issue if the receiving unit has been fielded the 10kW
TQG to replace the 10kW MEP generator. The MWO will be applied to unserviceable material
during scheduled Depot Maintenance. This MWO will not be applied to Condition Code H
material.
3. END ITEM OR SYSTEM TO BE MODIFIED. This modification will be applied to Container,
Refrigerated, Model SC209, NSN 8115-01-016-5909.
Table 1. End Item to be Modified
Nomenclature
National Stock
Type
CAGEC
Serial
Line Item
Number
and
Number
Number
Model
LIN)
Container,
90598
ALL
C84541
Refrigerated
4. MODULES (Components, Assemblies, Sub-Assemblies, Boards, and Cards) TO BE
MODIFIED. Not applicable.
5. PART(s) TO BE MODIFIED. Not applicable.
6. APPLICATION.
a. Time Compliance Schedule: The MWO effective date is 01 January 2004 and the
completion date is 01 January 2008.
b. Level of Maintenance: General Support Maintenance is the lowest level of maintenance to
support this MWO.
c. Time Required: This MWO requires 2 people for 12 hours and 1 forklift operator for 1 hour
to complete task. A total of 25 man-hours is required for a single installation of this MWO. MOS
44B personnel or equivalent (certified to weld steel materials) are required to perform welding
operations. Licensed forklift operator is required.
This MWO can be applied concurrently with MWO 55-8145-200-30-1. If MWO 55-8145-200-30-1
is already applied, this MWO may be applied separately.
7. TECHNICAL PUBLICATIONS AFFECTED/CHANGED.
1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business