|
|
DRAFT
TB 9-2320-279-13-1
AC HOSES REPLACEMENT - Continued
HOSE ASSEMBLY #6 2524 INSTALLATION
HEMAC103
NOTE
Refer to Appendix A, Figure A-2, for routing and location of AC hoses.
Install cable ties as required.
Route AC hose as noted prior to removal.
Ensure preformed packings are in place in AC hose prior to installation.
1. Install preformed packing (24) and hose 2524 (1) on fitting (25). Torque hose 2524 (1) to 11-13 ft-lbs.
(15-18 Nm).
HEMAC102
2. Position hose 2524 (1) in cushion clip (22).
3. Install cushion clip (22) on bracket (23) with screw (21) and locknut (20).
0040-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |