|
|
DRAFT
TB 9-2320-279-13-1
AC SYSTEM REFRIGERANT (R-134a) MAINTENANCE - Continued
FOLLOW-ON MAINTENANCE
1. Leak test air conditioning system (WP 0049).
2. Check operation of AC system (WP 0004).
3. Engine OFF (TM 9-2320-279-10).
END OF WORK PACKAGE
0050-18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |