|
|
TB 9-2320-279-13-1
4. HEATER/EVAPORATOR INSTALLATION.
This task covers:
a. Heater/Evaporator Installation.
b. Follow-On Maintenance.
Supplies (Cond't)
INITIAL SETUP
Defrost Cable
Models
Air Conditioner Cable
(4) Speed Nut-3/16 in.
All
Fan Label
Test Equipment
Air Conditioner Temperature Label
Rotory Switch Kit
None
Optic Ribbon
Special Tools
(5) Bezel
(2) Wire Assembly
Nutsert Tool
(2) Air Diffuser Ball
Torque Wrench
Heater Hose Elbow
Supplies
(3) Hose Clamp
Heater/Evaporator
Personnel Required
Lower Plenum
MOS 52C, Utilities equipment repairer (3)
Damper
(2) Upper Plenum
References
(6) Screw-8-32 x 3/4 in.
None
Gasket-1/2 in. x 1/2 in.
Straight Fitting
Equipment Condition
Straight Fitting
None
Insulation
1300 3M Adhesive
Special Environmental Conditions
(4) Grommet
None
PVC Foam Tape
(6) Lockwasher-1/4 in.
General Safety Instructions
(6) Screw-1/4-20 x 3/4 in.
(8) Cable Tie
None
Fresh Air Box Opening Cover
PVC Foam Tape
(14) Screw-10-32 x 1/2 in.
Heat Cover
(4) Hole Plug-5/16 in.
(4) Hole Plug-3/8 in.
Hole Plug-3/4 in.
(4) Defrost Louver
(16) Threaded Insert
(16) Washer-#10
(16) Screw-10-32 x 3/4 in.
(12) Lockscrew-1/4-20 x 1/2 in.
Heater Compartment Center Cover
Heater Cable
0052-29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |