|
|
TB 9-2320-279-13-1
17. Drill two pilot holes (25) in cab (26).
NOTE
Do not enlarge two pilot holes bigger than opening in insulation (6).
18. Enlarge two pilot holes (25) with "nibbling" tool to allow two fittings (2 and 5) on heater/evaporator (3) to
pass through cab (26).
19. Install two grommets (27) in cab (26).
20. Install four PVC foam tape strips (28) on cab (26).
CAUTION
If fresh air box cover is not installed as
shown, evaporator vent tubes will not be
installed correctly. Failure to comply may
cause damage to equipment.
21. Soldier A supports plate (29) on
underside of vehicle while Soldier B
installs fresh air box cover (30) and plate
(29) on cab (26) with 14 screws (31).
22. Install two grommets (32) in fresh air
box cover (30).
0052-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |