Click here to make tpub.com your Home Page

Page Title: Charging. (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-279-13-1
8.
Connect hand valve (9) on hose (10) to service valve (4).
9.
Connect hand valve (11) on hose (12) to service valve (7).
NOTE
Perform Step 10 with engine off and low-side hand valve closed.
10. When charging from bulk container, position bulk container (13) upside down and open high side
hand valve (14).
11. Allow refrigerant to enter system until 27 oz. (765 g) has been added. Close high side hand valve (14).
12. Start engine (TM 9-2320-279-10). Position personnel cab air conditioner controls at maximum cooling
and fan speed. Refrigerant compressor must engage.
13. Shut OFF engine (TM 9-2320-279-10).
0052-46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business