Click here to make tpub.com your Home Page

Page Title: Table 2-2. Operator's Preventive Maintenance Checks and Services (Weekly) - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

DRAFT
TB 9-2320-364-13&P-1
OPERATOR'S PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) -
Continued
Table 2-2.
Operator's Preventive Maintenance Checks and Services (Weekly) (Continued)
Location
Item
Not Fully Mission
Interval
Item to
Procedure
No.
Capable if:
Check/Service
PLSAC124
5
Weekly
AC Hoses,
(a) Left side noise panel and rubber flap
Fittings, and Wire
removed (WP 0051).
Harness
(b) Electronic control box (ECB) right side
panel removed (TM 9-2320-364-20).
(c) Check three AC hoses (1) for looseness
or damage. Notify Field Level
Maintenance if AC hoses (1) are loose or
damaged.
(d) Check three AC hoses (1) at connections
for oil leakage, cracking, and chafing.
Notify Field Level Maintenance if leaks,
cracks, or chafing are found on AC
hoses (1).
(e) Check AC wire harness (2) for corrosion,
breakage, fraying, and loose
connections. Notify Field Level
Maintenance if wire harness (2) is
damaged.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0003-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business