|
|
DRAFT
TB 9-2320-364-13&P-1
AC HEATER/EVAPORATOR REPLACEMENT - Continued
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
PLSAC146
7. Install wire 1156 (37) on OUT terminal of temperature control switch (38).
8. Install wire 1082 (35) on terminal B of fan control switch (36).
PLSAC145
9. Install center cover (33) on console (34) with four screws (32).
CAUTION
Do not puncture temperature probe. Failure to comply will cause gas in tube to leak
out.
Install temperature probe slowly into heater/evaporator. Failure to comply may
result in damage to temperature probe.
NOTE
Temperature control switch temperature probe is installed correctly when it is inserted into
the AC evaporator core until it touches bottom of the insertion hole.
10. Slowly slide temperature probe (31) into heater/evaporator (20).
0037-12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |