Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

DRAFT
TB 9-2320-364-13&P-1
AC LOW PRESSURE SWITCH REPLACEMENT - Continued
INSTALLATION
PLSAC049
NOTE
Lightly lubricate preformed packing with PAG oil prior to installation.
Ensure preformed packing is in place in low pressure switch prior to installation.
1. Install preformed packing (6) and low pressure switch (5) on hose 2522 (7). Torque low pressure
switch (5) to 7.5-10 ft-lbs. (10-14 Nm).
NOTE
Install cable ties as required.
2. Connect connector (3) to connector (4).
3. Connect connector (1) to connector (2).
FOLLOW-ON MAINTENANCE
1. Install electronic control box cover (ECB) right side panel (TM 9-2320-364-20).
2. Connect batteries (TM 9-2320-364-20).
3. Perform leak test inspection (WP 0052).
END OF WORK PACKAGE
0040-3/(0040-4 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business