|
|
TB 9-2320-364-13&P-1
3. CONDENSOR INSTALLATION.
This task covers:
a. Condensor Installation.
INITIAL SETUP
Supplies (Continued)
Models
Battery Instruction Label
(8) Rivet
All
(5) Nutsert
Test Equipment
Locknut - 1/2 in.
Template, Access Trimming
None
Template, Ether Holes
Special Tools
Template, Hose Cutout
Drawing, Skin Rework
Drill, Electric, Portable (TM 9-2320-364-20,
Drawing, Noise Panel
Item 17, Appendix G)
Drawing, Condensor
Tool Kit, Blind Rivet (TM 9-2320-364-20,
Item 72, Appendix G)
Personnel Required
Rivet Gun (TM 9-2320-364-20,
Two
Item 58, Appendix G)
References
Supplies
None
Air Conditioner Condensor
Connector 2 Pin
Equipment Condition
(2) Socket Contact
None
(2) Seal
Double Cushion Clip
Special Environmental Conditions
Condensor Mounting Bracket
(2) Screw - 5/16-18 x 1 in.
None
(4) Screw - 3/8-16 x 1 in.
General Safety Instructions
Condensor Support Bar
Condensor Stabilizer Bracket
None
(2) Screw - 5/16-18 x 1 in.
(2) Locknut - 5/16 in.
0055-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |