Click here to make tpub.com your Home Page

Page Title: Heater/Evaporator Installation. - continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-364-13&P-1
45. Drill 0.469 in. (11.91 mm) hole (68) on
side of ECB (69).
46. Install 20 amp circuit
breaker (70) on ECB (69)
with nut (71). Tighten
nut (71) to 16-24 lb-in
(1.8-2.7 Nm).
47. Connect wire assembly
1082 (72) to terminal on
20 amp circuit breaker (70).
48. Install wire (73) on 20 amp
circuit breaker (70) with
screw (74) and lockwasher (75).
49. Install wire (73) on circuit
breaker 15 (76) with
screw (77) and lockwasher (78).
0055-45

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business