|
|
TB 9-2320-364-13&P-1
73. Remove two caps (107) from two fittings (3 and 6).
74. Install two heater hoses (108) on coolant tubes (30)
and tighten two hose clamps (109).
75. Install heat cable (55) on shaft (110) of heater
control valve (111).
76. Place heat cable (55) in retainer (112) and tighten
screw (113).
77. Install preformed packing (114) and hose 2524 (115)
on fitting (3). Torque hose 2524 (115) to 11-13 ft-lbs.
(15-18 Nm).
78. Install preformed packing (116) and hose 2522 (117)
on fitting (6). Torque hose 2522 (117) to 18-22 ft-lbs.
(24-30 Nm).
79. Connect connector (106).
0055-50
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |