|
|
TM 10-4110-262-13&P
0007 00
Procedure 1 Covers:
Failure to maintain interior temperature
Initial Setup:
ADR-300 in operation
Maintenance Level:
Operator
Materials / Parts:
None
Procedure 1
No
Procedure 2
Is the RU Running?
Yes
Is the interior temperature
Yes
No
displayed on the RU control
Close container
Is the container door closed?
more than 4 degrees from the
door
set point?
Yes
No
No
Has a large cargo recently
Procedure 3
been placed in the container?
The unit is
running to
Yes
specification
Allow the system to run for
30 to 60 minutes (Initial start-
up for a warm IC may take
about 6 hours to reach the
set point.
Has the interior temperature
Yes
No
Procedure 3
moved toward the correct
range?
0007 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |