| |
TM 10-4130-239-14
4-34.
FLYWHEEL AND RING GEAR ASSEMBLY REPLACEMENT (CONT)
8.
Install blower housing.
Install eight blower housing mounting
bolt, starter panel assembly and starter cable clamp.
9.
Install flywheel pulley.
Install two lockwashers and two
flywheel pulley mounting bolts.
4-35.
HIGH PRESSURE SWITCH CONTINUITY TEST.
This task covers testing only.
Equipment
Condition
Para
Condition Description
2-8
Engine stopped.
4-15
Housing removed.
Tools
Multimeter, item 2,
Appendix B
1.
Prepare multimeter for continuity testing.
2.
Remove single wire for testing.
4-77
|