| |
TM 10-4130-239-14
SECTION
I.
II.
CHAPTER 1
INTRODUCTION
INDEX
TITLE
GENERAL INFORMATION
EQUIPMENT DESCRIPTION AND DATA
III.
PRINCIPLES OF OPERATION
1-1.
SCOPE.
a.
Type of
Maintenance.
PAGE
1-1
1-2
1-6
Section I.
GENERAL INFORMATION
Manual:
Operators, Unit, Direct and General Support
b.
Model Number and Equipment Name:
Airtacs model A-WC40-G/E,
Small Mobile Water Chiller, 40 GPH at 70 Degrees with Support Kit and
Trailer Mounting Kits.
Purpose of Equipment:
The water chiller cools intake water to
60°F (16°C) and delivers it at 40 gallons (151 liters) per hour.
1-2.
MAINTENANCE FORMS, RECORDS AND REPORTS.
Department of the Army
forms and procedures used for equipment maintenance will be those
prescribed by DA PAM 738-750, The Army Maintenance Management System
(TAMMS) .
1-3.
DESTRUCTION OF ARMY MATERIAL TO PREVENT ENEMY USE.
Refer to
TM-750-244-3, Procedures for Destruction of Equipment to Prevent
Enemy Use, for information about destruction.
1-4.
PREPARATION FOR STORAGE OR SHIPMENT.
a.
Placement of equipment in administrative storage should be for
short periods of time when a shortage of maintenance effort exists.
Items should be in mission readiness within 24 hours or within the
time factors as determined by the directing authority.
During the
storage period appropriate maintenance records will be kept.
b.
Before placing equipment in administrative storage, next
scheduled maintenance service should be completed, shortcomings and
deficiencies should be corrected, and all Modification Work Orders
(MWOS) should be applied.
1-1
|