| |
TM 10-4130-239-14
5-19.
EXPANSION VALVE REPLACEMENT.
This task covers:
Testing, Removal and Installation
Equipment
Condition
Para
Condition Description
2-8
Engine stopped.
4-15
Housing removed.
5-3
Refrigeration system
discharged.
4-1
Engine oil drained.
Tools
Tool Kit, Service
Refrigeration, item 5,
Appendix B
Tap and Die Set
(5136-01-119-0005)
item 3, Appendix B
Materials/Parts:
Sealant Compound, item
27, Appendix E
1.
Cut tie wraps and remove insulation covering expansion valve bulb
being careful not to nick bulb or line.
5-39
|