| |
TM 10-4130-239-14
5-26.
THERMOSTATIC VALVE REPLACEMENT (CONT)
8.
Remove tubing subassemblies from thermostatic valve.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Install tubing subassemblies on thermostatic valve.
Place thermostatic valve and fuel heat exchanger in skid as one
assembly.
Connect union joints on water system.
Connect compression fitting on end of the fuel heat exchanger.
Spray thermostatic valve and fuel heat exchanger with mold
release.
Fill in open areas with polyurethane foam.
Install bottom plate.
Install 16 bottom plate mounting screws
using sealing compound.
Set water chiller on skid base.
Attach fuel line to union.
10. Add oil (para 4-1).
5-64
|