| |
TM 10-4130-239-14
5-31.
SKID REPLACEMENT (CONT)
3.
Remove grommet from insulation barrier.
4.
Drill out rivets and remove insulation barriers.
5.
Drill out rivets or remove screws and lockwashers securing
keepers.
Remove keepers.
6.
Remove screw and lockwasher securing bead chain fastener to skid.
Remove quick release pin and chain.
7.
Remove handle retaining screw securing handle and spring to skid.
Remove handle and spring.
1.
2.
3.
4.
5.
6.
7.
Install handle retaining screw while holding handle and spring in
place.
Attach quick release pin chain and fastener to skid with screw
and lockwasher.
Attach keepers to skid with rivet or screws and lockwashers.
Align holes and rivet insulation barriers to skid.
Insert grommet into insulation barrier.
Install panel couplings.
Attach four shackles.
5-32.
TRAILER MOUNTING KIT INSTALLATION.
This task covers:
Installation
Tools
Materials/Parts:
Tool Kit, General Mechanics,
Welding Rods, item 25,
item 1, Appendix B
Appendix E
Personnel Required:
Four to lift water chiller.
5-76
|