Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: START RUN Water Control
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   10-4130-239-14 Table 2-1. Operator Preventive Maintenance Checks and Services (Cont) B - Before D - During A - After W - Weekly M - Monthly H - Hourly Item Interval Item To Be Inspected Equipment Is Not Procedure Ready/Available  If No. B    D   A W   H M 11 12 13 START  RUN  Water  Control. (Ball  Valve  Assembly)  Turn  control back  and  forth  to  check  operation. 12 VOLT INPUT FOR START- ING Connection. Check for dam- age. Refrigerant. Look through RE- FRIGERANT SIGHT GLASS after 15 to 20 minutes of operation. Control  will  not  move. Starting   connection damaged. REFRIGERANT  SIGHT GLASS not showing clear,  bubble-free refrigerant with green center. 2-12   Change  2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business