| |
TM 10-4130-239-14
Section IV.
UNIT PREVENTIVE MAINTENANCE
4-11.
GENERAL .
AND SERVICES (PMCS)
a. Always keep in mind the WARNINGS and CAUTIONS while performing
PMCS.
b.
Preventative Maintenance Checks and Services (PMCS, Table 4-1)
are to be completed to ensure the water chiller is ready to use at
all times.
These checks and services help you find and repair
defects before the water chiller is damaged or fails.
c.
All deficiencies and shortcomings shall be recorded together
with the corrective action taken on DA Form 2404 (Equipment
Inspection and Maintenance Worksheet) at the earliest opportunity.
d.
If your equipment fails to operate, troubleshoot with proper
equipment.
Report any deficiencies using proper forms.
(See DA PAM
738-750).
4-12.
PMCS PROCEDURE.
a.
Purpose.
The PMCS table lists the inspections and care of the
equipment required to keep it in good operating condition.
b.
Use.
To perform PMCS, follow the directions listed for each
column below.
(1) Item No.
This column numbers the checks and services in
order of performance.
It is the source of item numbers for the TM
Number Column on DA Form 2404, Equipment Inspection and Maintenance
Worksheet.
(2) Interval.
This column tells you when to do a certain check
or service.
The codes in this column are as follows:
W - Perform these checks and services once per week.
M - Perform these checks and services once per month and upon
receipt of new equipment.
H - Perform these checks and services after the number of hours
of equipment operation listed in the column.
(3) Item to be Inspected Procedure.
This column tells you what
item is to be inspected.
It also tells you how to do the required
checks and services.
Carefully follow these instructions. If
directed by the procedure, or if you do not have the required tools,
refer the equipment to Direct Support maintenance.
4-8
|