Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: GENERAL INFORMATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

GENERAL INFORMATION •  UNPACK 1  Lay carton on rear face and break open bottom flaps. 2    Set  carton  upright  with  all  four  flaps  outward.    See Figure 3. 3  Lift carton up and off of machine. 4    Remove  all  tape  and  packaging  material  from  the outside and inside of the cabinet.  See Figure 4. 5    Remove  the  front  grill;  take  out  the  screws  securing the grill at the bottom and lift it free of cabinet 6  Turn the fan by hand to make certain it moves freely. 7    Loosen  thumb  screws  holding  cutter  grid  and  water pan to "thumb tight." •  UTILITIES OBSERVE LOCAL CODES Each installation is unique but will require: 1 A cold water inlet of 1/4" OD soft copper tubing and a shut-off valve. 2  Either  a  gravity  drain  system  or  a  sump  pump  to  lift the water to an existing drain. 3   An   electrical   branch   circuit   of   115   Volt,   60   Hz,   1 phase,  with  a  15  Amp  delayed  action  fuse  or  circuit breaker. •  LOCATE UNIT 1      Place   unit   so   the   front   side   will   be   completely unobstructed.  to provide proper air flow 2      Area   should   be   well   ventilated   with   temperature above   55°F   and   below   110°F.      Best   results   are obtained between 70°F and 90°F. 3  Provision for electricity.  water and drain connections should be determined. 4  The unit may be closed in on the top and three sides, but     the     front     MUST     BE     unobstructed     for     air circulation and proper operation Installation should be such   that   the   cabinet   can   be   moved   forward   for servicing, if necessary. •· LEVEL UNIT 1    After  placing  unit  in  position,  check  to  make  certain the unit is level side to side and front to back. 2  Accurate leveling is essential for proper operation. 3  Unit should be shimmed so that it is solid as well as level.  The shims should be of hard permanent type material such as masonite. 4  If required by sanitation code, seal the cabinet to the floor with an approved caulking compound. 3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business