Section II SERVICE UPON RECEIPT 
Para. 
Para. 
Unloading ........................................................4-2 
Installation Site Preparation .................................... 4-6 
Unpacking .......................................................4-3 
Refrigerator Unit Preparation for Installation........... 4-7 
Receiving Inspection .......................................4-4 
Installation Instructions ........................................... 4-8 
Site Selection...................................................4-5 
Unit Preparation for Operation ................................ 4-9 
4-2. UNLOADING 
The refrigeration unit may be removed from the bed of the carrier by either a crane or forklift truck. Be sure that the 
crane or forklift truck is large enough to handle the load. If the unit is to be removed with a crane, install suitable slings 
around the bottom of the shipping package. Keep the equipment in an upright position at all times. 
WARNING 
Do not allow the unit to swing while suspended from a lifting device. Failure to observe this warning may 
result in injury to personnel and damage to the equipment. 
4-3. UNPACKING 
a. General. Normally, the packaged refrigerator should be moved into the immediate area in which it is to be installed 
before it is unpacked. 
NOTE 
The shipping container is of such a design that it may be retained for reuse for mobility purposes if 
frequent relocation of the refrigerator is anticipated. 
b. Remove Shipping Container. 
(1) Remove top of the crate. 
(2) Remove front and rear ends. 
(3) Remove sides of crate. 
(4) Remove the packing material and protective covering material. 
(5) Remove the technical publications envelope and all other containers and put them in a safe place. 
(6) Loosen the four mounting angle nuts that hold the unit to the center wood frame. 
(7) Remove the center wood frame. 
(8) Lift refrigerating unit from skid by the two Dee type lifting rings provided on top of the unit. 
4-4. RECEIVING INSPECTION 
Perform receiving inspection of the refrigerator in the following manner: 
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report 
/ 
damage on DD Form 6, Packaging Improvement Report. 
4-2 
 | 
| 
 