|
|
TM 5-4110-240-13&P
B-Before operation
D-During operation
W-Weekly
M-Monthly
ITEM
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT WILL BE REPORTED
NO.
B DWM
PROCEDURE
NOT READY IF:
Safety Latch. Check for cracks, breaks,
Latch is damaged,
4
excessive wear, and loose or missing
mounting hardware is
hardware. Operate push rod to ensure
loose or missing,
it opens latch
or push rod fails to open
latch.
CUT-AWAY
5
Safety Latch. Lubricate with low
Latch sticks.
viscosity SAE oil once a month.
2-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |