|
|
TM 5-4110-240-13&P
B-Before operation
D-During operation
W-Weekly
M-Monthly
ITEM
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT WILL BE REPORTED
NO.
B DWM
PROCEDURE
NOT READY IF:
14
Vapor Proof Light and Bulb. Check for
Vapor proof light fixture or
cracks, breaks, and loose or missing
globe are damaged.
hardware.
15
Vapor Proof Light Bulb. Unscrew globe
Vapor proof light bulb is
to expose bulb. Inspect bulb for
unusable.
serviceability.
16
Power Receptacle. Check for cracks,
Power receptacle is
damaged pins or cover, and loose or
damaged.
missing hardware.
Change 2
2-9
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |