|
|
TM 5-4110-240-13&P
B-Before operation
D-During operation
W-Weekly
M-Monthly
ITEM
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT WILL BE REPORTED
NO.
B DWM
PROCEDURE
NOT READY IF:
24
Closure Plug Assembly. Check for
Closure plug is damaged
cracks, breaks, loose or missing hard-
or loose.
ware, and loose mounting.
NOTE
Closure plug may be removed
when mechanical refrigeration
is installed.
25
Gasket. Check gasket for wear or
Gasket is worn or
damage
damaged.
2-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |