Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section I 1. MOVEMENT TO A NEW WORKSITE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Caution:  For  safe  operation,  connect  a  No. of   installation.   Mount   air   filter   in  duct  work  if  an 10   AWG   (min.   )   ground   wire   to   ground   con- evaporator   return   air   duct   is   required. nection. c.  Connections.  Connect   the   main   power   cable. Note.   Operation   without   filtration   will   clog   coils d.  Air  Ducts.  Connect   air   ducts   contingent   to   site 2-5.   Dismantling   for a.   Disconnect   main b.  Disconnect   drain c.   Disconnect   any Section I 1. MOVEMENT   TO   A   NEW   WORKSITE Movement distance, recrate   it   by   reversing   the   unpacking power   cable. procedures.    See   paragraph   2-2. lines   from   the   outlets. 2-6.   Reinstallation   After   Movement air   ducts   and   install   the After    movement,    follow the P r o c e d u r e s    in evaporator   air   discharge   grille   and   air   return   grille. d.  Remove  the  unit  from  the  mounting  surface. paragraph   2-4   to   reinstall   the   air   conditioner. e.  If  the  air  conditioner  is  to  be  moved  over  a  long Section   Ill.   CONTROLS   AND   INSTRUMENTS 2-7.  General 2-8.   Controls   and   Instruments This   section   describes,   locates   and   illustrates   the The  location   and   the   function   of   the   controls   and various   controls   and   provides   the   operator   /   crew installments   are   illustrated   in   figure   2-3. sufficient   information   to   insure   proper   operation   of the   air   conditioner. 2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business