| |
Caution: For safe operation, connect a No.
of installation. Mount air filter in duct work if an
10 AWG (min. ) ground wire to ground con-
evaporator return air duct is required.
nection.
c. Connections. Connect the main power cable.
Note. Operation without filtration will clog coils
d. Air Ducts. Connect air ducts contingent to site
2-5. Dismantling for
a. Disconnect main
b. Disconnect drain
c. Disconnect any
Section I 1.
MOVEMENT TO A NEW WORKSITE
Movement
distance,
recrate it by reversing the unpacking
power cable.
procedures. See paragraph 2-2.
lines from the outlets.
2-6. Reinstallation After Movement
air ducts and install the
After movement, follow
the
P r o c e d u r e s in
evaporator air discharge grille and air return grille.
d. Remove the unit from the mounting surface.
paragraph 2-4 to reinstall the air conditioner.
e. If the air conditioner is to be moved over a long
Section Ill. CONTROLS AND INSTRUMENTS
2-7. General
2-8. Controls and Instruments
This section describes, locates and illustrates the
The location and the function of the controls and
various controls and provides the operator / crew
installments are illustrated in figure 2-3.
sufficient information to insure proper operation of
the air conditioner.
2-3
|