Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Removal
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

Figure  4-8. b.   The   control   should   be   adjusted   for   the   center position   between   open   and   closed.   The   actuator should  then  be  in  the  centered  position  and  the  rod on   top   of   the   damper   should   be   parallel   with   front of   the   housing. c.   Check   operation.   The   control   should   move smoothly   between   the   open   and   closed   position. 4-28.  Removal a.  Vent   Damper.   Refer   to   paragraph   4-21   and remove   the   housing   covers.   Refer   to   figure   4-8   and remove   vent   damper   as   follows: (1)   Loosen   screw   on   mechanical   post   and disconnect   push-pull   control. (2)   Remove   two   screws   and   lock   washers   and lift   vent   darnper   from   air   conditioner. b.   Push-Pull   Control.   Refer   to   paragraph   4-18 and  remove  evaporator  louvers.  Refer  to  figures  4-7 and   4-8   and   remove   push-pull   control   as   follows: (   1   )   Remove   screw,   washer,   nut,   spacer,   and loop   clam   p. (2)   Loosen   screw   on   mechanical   post   to   free end   of   control   wire   core. (3)   Remove   outer   nuts   from   both   ends   of control   outer   casing   and   remove   push-pull   control. c.  Vent  Control  Actuator.   Refer   to   figure   4-7   and Vent  damper. remove    screw.    nut,   two   spring   washers   and   a c - tuator. 4-29.   Cleaning,   Inspection   and   Repair Clean,  inspect  and  repair  vent  damper  and  control as  follows: a.  Wipe  off  all  loose  dirt  with  a  dry  cloth. b.  Inspect   push-pull   control   for   smooth   operation of   core   in   casing.   Inspect   vent   damper   for   bent   or broken   condition,   Replace   defective   parts.   Inspect for  loose  or  damage  rubber  seal  on  damper.  Cement loose   rubber   or   replace   rubber   if   damaged.   Inspect actuator   for   bent   condition.   Straighten   actuator   or replace   as   required. 4-30.   Installation a.   Vent   Control   Actuator.   Refer   to   figure   4-7   and install   actuator,   screw,   two   spring   washers   and   nut. b.   Vent   Damper.   Refer   to   figure   4-8   and   install vent   damper   in   opening   in   housing.   Secure   vent damper   cover   to   housing   with   two   screws   and   lock washers. c.   Push-Pull   Control.   Refer   to   figures   4-7   and   4-8 and   install   control   as   follows: (  1  )  With  one  nut  on  each  end  of  outer  casing  of push-pull   control,   install   ends   of   control   through 4-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business