Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section XVI. MAINTENANCE OF TRANSFORMER, RECTIFIER, AND PRESSURE SWITCHES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

d.  Phase  Sequence  Relay.  To  remove  the  phase sequence  relay  from  three  phase  units,  refer  to figure  4-20  and  remove  relay  as  follows: (1)  Remove  four  screws  (13),  nuts  (14),  and washers   (15). (2)   Remove   relay   (17)   and   two   each   of washers  (15  and  16). e. Time Delay Relay. To remove the time delay relay,  refer  to  figure  4-20  and  remove  relay  as follows: (1)  TO remove  time  delay  (18)  from  three phase units, remove the phase sequence relay then remove  two  remaining  screws  (13),  nuts  (14),  and flat  washers  (15). (2)  TO remove  time  delay  relay  (18)  from single  phase  units,  remove  four  screws  (13),  nuts (14),  and  flat  washers  (15). f. Control Circuit Breaker. To remove the control circuit   breaker   (19,   fig.   4-20),   remove   circuit breaker  nut  from  front  of  junction  box  and  pull breaker  to  the  rear  of  the  junction  box. 4-53.   Assembly a. General. Refer to figure 4-20 and install any components  that  were  removed.  After  installation of  components,  make  all  the  necessary  electrical connections. b. Control Circuit Breaker. Install control circuit breaker (19) through opening in junction box with locating   projection   in   opening   provided.   Install breaker  nut. c.  Time  Delay  Relay.  Install  time  delay  relay (18)  on  junction  box.  Secure  relay  to  single  phase junction  box  with  four  screws  (13),  nuts  (14),  and washers (15). For three phase junction boxes, omit the  two  inner  sets  of  hardware. d.  Phase  Sequence  Relay.  To  install  the  phase sequence relay on three phase junction box proceed as  follows: (1)  Place  a  flat  washer  (15)  and  flat  washer (16) over inner mounting holes of phase sequence relay. (2)   Install   phase   sequence   relay   (17)   on washers  and  mounting  flange  of  time  delay  relay. Install four screws (13), flat washers (15), and nuts (14). e.  Condenser  Fan  Relay.  Install  condenser  fan relay  (12)  on  bracket  (11)  a  nd  secure  relay  with three nuts (9) a nd flat washers (10). Install bracket on junction box and install two screws (6), nut. (7), a nd washers (8). f. Heater and Compressor Motor Relays. Install heater relay (5) or compressor motor relay (4) and secure relay with four screws (1), nuts (2) and flat washers   (3). 4-54.   Installation a.  Make  any  electrical  connections  that  were disconnected  during  removal. b. Carefully install junction box into housing and install  seven  screws  and  lock  washers. c.  Refer  to  paragraph  4-48  and  install  control module. d. Refer to paragraph 4-21 and install top front cover. Section XVI. MAINTENANCE OF TRANSFORMER, RECTIFIER, AND  PRESSURE  SWITCHES 4-55.    General The   power   transformer   and   rectifier   reduces   the power   voltage   and   converts   the   alternating   current to  24  volt  direct  current  to  operate  the  coils  and switches  in  the  control  circuit.  The  transformer  is rated   at   a   secondary   voltage   of   30   vac   with   a primary  voltage  of  115  vac.  The  transformer  and rectifier   are   located   below   the   junction   box.   The high   and   low   pressure   cutout   switches   are   also located   below   the   junction   box   with   the   reset buttons  extending  through  the  front  of  the  housing. The  pressure  cutout  switches  are  connected  in  the refrigeration  system  and  are  electrically  connected in  the  control  system  to  the  compressor  motor  relay coil.  Extreme  high  or  low  pressure  opens  the  circuit causing   the   compressor   to   stop. 4-56.    Transformer a.   Testing.   Test   transformer   as   follows: (1)  Refer  to  paragraph  4-21  and  remove  top cover.   Refer   to   paragraph   4-50   and   partially remove   junction   box. (2)  Disconnect  leads  and  check  for  continuity across   the   primary   winding   and   then   across   the secondary   winding. If   either   winding   is   open, replace   the   transformer. (3)  Check  for  shorts  between  one  terminal  a  nd transformer   case   and   also   between   one   primary terminal   and   one   secondary   terminal   using   an insulation   tester,   megger   or   multimeter   on   high ohms  setting.    Replace   transformer   if   a   short   is indicated. b.  Removal.  With  junction  box  removed,  refer  to figure   4-21   and   remove   four   screws   and   lock washers.   Disconnect   and   remove   transformer. c.   Installation.   Refer   to   figure   4-21   and   install transformer,   four   screws,   and   four   lock   washers. Connect   leads.   Refer   to   paragraph   4-54   and   install junction   box. 4-31

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business