Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section XV. JUNCTION BOX
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

b.  Circuit  Breaker.  Refer   to   figure   4-18   and remove  handle  shaft  and  spacers.  Remove  screws and   washers   that   secure   circuit   breaker   to mounting  plate  and  designation  plate  and  remove circuit breaker. Single phase breakers are attached with  four  screws  and  washers  and  three  phase breakers are attached with six screws and washers. c. Evaporator Fan Toggle Switch.  Refer to figure 4-18  and  remove  the  switch  nut  and  lock  washer. Remove  toggle  switch. d.  Temperature  Selector  Switch.  Refer  to  figure 4-18  and  remove  nut  and  capillary  tube  clamp. Remove  four  screws,  nuts,  and  washers.  Remove switch  knob  and  temperature  selector  switch. e.  Mode  Selector  Rotary  Switch.  Refer  to  figure 4-18,  loosen  setscrew  in  knob,  and  remove  knob. Remove  switch  nut  and  switch. 4-47.  Assembly a. General.  Refer  to  figure  4-18  and  install  any components   that   were   removed.   Complete   the assembly  as  described  in  f  below. b. Circuit Breaker. Install circuit breaker, screws and  washers.  Assemble  handle  spacers  and  shaft. c. Evaporator Four Toggle Switch.  Install  toggle switch  and  secure  to  mounting  plate  with  switch nut  and  lock  washer. d.  Temperature  Selector  Switch.  Install   switch and  secure  with  four  screws,  washers  and  nuts. Install switch knob. Install clamp on capillary tube and  secure  clamp  with  nut. e.  Mode  Selector  Rotary  Switch.  Install   switch and  secure  with  switch  nut.  Install  knob  and tighten setscrew. f. Control Module.  After  components  have  been installed, make all necessary electrical connections. Insert  a  capillary  tube  bulb  through  opening  in cover.  Install  cover  and  mounting  screws.  Install capillary  tube  grommet. 4-48.  Installation a.  Install  temperature  selector  switch  bulb  and tube  through  slot  in  junction  box.  Install  bulb  in clamps  (fig.  4-17)  and  tighten  screws. b.  Install  control  module  into  junction  box  and turn  connector  knob  clockwise  until  screw  is  tight. c. Refer to paragraph 4-18 and install evaporator air  inlet  louver. Section   XV.   JUNCTION   BOX 4-49.  General The  junction  box  (fig.  1-1)  contains  the  time  relay delay,  control  circuit  breaker,  condenser  fan  relay, heater  relay,  and  compressor  motor  relay.  Three phase  junction  boxes  also  contain  the  phase sequence  relay. 4-50.  Removal a. Refer to paragraph 4-21 and remove front top cover. Refer to paragraph 4-44 and remove control module. b.  Remove  seven  screws  and  lock  washers securing  junction  box  to  housing.  Partially  remove the junction box by pulling the box forward and out of the air conditioner. See figure 4-19. Support the junction  box  to  relieve  strain  on  wiring. c.  To  completely  remove  the  junction  box  it  is necessary to disconnect all the electrical leads and connectors. 4-29

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business