Figure 5-1. Evuporator coil, removal and installution.
(3) Refer to figure 3-4 and remove the con-
denser coil grille and screen.
(4) Remove the junction box (para 3-18).
(5) Remove the RF1 filter (para 318).
(6) Refer to figure 5-2 and remove the Con-
denser coil.
b. Installation.
(1) Install the condenser coil in reverse
order of removal. Refer to paragraph 63 for sol-
dering procedures.
(2) Pressure test, evacuate, and recharge
the refrigerant system ( para 65 ).
5-11. Electric Heater
a. Removal.
(1) Refer to figure 3-4 and remove the top
access cover.
(2) Refer to figure 5-3 and remove the elec-
tric heater.
b. Installation. Installation is the reverse of re-
moval.
5-12. Sight Glass
a. Removal.
(1) Discharge the refrigerant system (para
63 ).
(2) Refer to figure 3-4 and remove the top
access cover.
(3) Refer to figure 5-4 and remove the sight
glass.
b. Installation.
(1) Install the sight glass in reverse order
of removal. Refer to paragraph 63 for soldering
procedures.
(2) Pressure test, evacuate, and recharge
the refrigerant system (para 6-5).
5-13. Regulating Valve
a. General. The pressure regulating valve is de-
5-4
|