Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-6. Starting instructions.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

STEP   1. POSITION   THERMOSTAT   FOR   DESIRED   TEMPERATURE. STEP  2. PLACE ROTARY SWITCH ON COOL POSITION FOR COOLING OPERATION, ON  LO  HEAT  OR  HI  HEAT  POSITIONS  FOR  HEATING  OPERATION,  OR  ON VENTILATE   POSITION   FOR   VENTILATING   OPERATION. Figure 2-6. Starting instructions. 2-15.    Operation    Under    Rainy    or    Humid 2-16.    Operation    in    Salt    Water    Areas Wash   the   exterior   of   the   unit   with   clean   fresh Conditions If  the  unit  is  outside  and  not  operating,  protect  it water   at   frequent   intervals.   Coat   exposed   metal with  a  canvas  or  waterproof  cover,  Remove  cover surfaces  with  rust-proofing  material.  Remove  cor- during  dry  periods.  Open  front  access  cover  to rosion,   and   paint   exposed   metal   surfaces.   Keep allow  unit  to  dry  before  operating.  Use  caution electrical  connections  dry. with   operating   electrical   equipment. 2-10

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business